
Check out these factors beforing installing jaw crusher :
- The Jaw Crusher should be installed in the place avoiding rain and sunlight.
- Jaw crusher motor should be installed behind the crusher; the direction of rotation should follow the requirement which cannot be changed.
- The Jaw Crusher should be installed on the concrete base, there should be a discharge chute in the concrete base, and the angle should exceed 50 º. The base condition can be decided according to the materials and transporting equipment.
- Loosen the spring before adjust the discharge outlet. After adjusting well, fasten the spring till the working noise of toggle plate and toggle plate seat is at minimum, and the toggle plate doesn’t fall down.
Make a trial run of your jaw crusher
- Check all the bolts are fastened before trial run.
- Check the lubrication before trial run.
- Turn the flywheel by hand first, trial-run can only carried out after confirmation that there is no block. There should be no impact, oil leak, shake of flywheel, and looseness of shaft within two hours.
- Trial run with loading for ten hours, if the stuff is hard, no above problems and the temperature of bearing doesn’t exceed 70℃, the machine can be put into operation.
Before starting up, make these preparations.
- Check the lubrication. (the manufacturer just oil the machine for trial run.
- Check whehter all the parts are fastened.
- Check the belts, if the belts or flywheel has been dirtied by oil, clean it immediately.
- The Jaw Crusher should be started up without loading, make sure that there is no stuff between mobile jaw plate and stationary jaw plate.
- When the stuff is very hard, the max feed size should less than 2/3 of the opening width.
- The Jaw Crusher should be started up without loading.
It's okay. Just start up your jaw crusher.
If you find anything wrong after starting up jaw crusher, stop the machine and check out carefully.
More Information About Jaw Crusher.
Get Price and Support
Simply complete the form below, click submit, you will get the price list and a SBM representative will contact you within one business day. Please also feel free to contact us by email or phone.
( * Denotes a required field)
![]()
Aluminum
Coal crusher
Cobalt Ore
Platinum
Silver mine
Tin ore
Granite rocks
Cement
Copper Ore
Bauxite
Basalt
Brick
Manganese
Concrete
Ballast
Bentonite
Tombarthite
Magnetite ore
Marble stone
Coal crusher
Cobalt Ore
Platinum
Silver mine
Tin ore
Granite rocks
Cement
Copper Ore
Bauxite
Basalt
Brick
Manganese
Concrete
Ballast
Bentonite
Tombarthite
Magnetite ore
Marble stone
Nickel
Gravel Sand
Palladium
Copper Ore
Gold Ore
Lead
Dolomite
Coal
Feldspar
Gypsum
Clay
Magnetite ore
Calcium carbonate
Limestone
Blast Furnace Slag
Iron Ore
Shale
Silica sand
Talc Mining
Gravel Sand
Palladium
Copper Ore
Gold Ore
Lead
Dolomite
Coal
Feldspar
Gypsum
Clay
Magnetite ore
Calcium carbonate
Limestone
Blast Furnace Slag
Iron Ore
Shale
Silica sand
Talc Mining
![]()













